Nokia

Nokia Lumia 1020

Nokia Lumia 1020

Hardware Unfortunately, Microsoft has not released a version for Windows Phone updates to OEMs can increase the quality of the hardware to your device, such as quad-core or Full HD screen. Therefore, the Nokia Lumia 1020 still uses the Snapdragon S4 dual-core 1.5 GHz speed with Adreno 225 graphics core similar Nokia Lumia 920. However

Nokia Lumia 1020 Read More »

Nokia Lumia 920 1

Nokia Lumia 920

At the moment, Windows Phone 8 product series was launched first with prominent names like the Nokia Lumia 920, Nokia Lumia 820, Samsung Ativ S, HTC 8X, HTC 8S. This is showing positive signs for the Microsoft mobile platform where manufacturers have tried more product launches new phones using the platform. The most notable of

Nokia Lumia 920 Read More »

Nokia 500

Nokia 500

Main function Support 3-band GSM / GPRS / EDGE, 3G HSDPA 14.4 Mbps and HSUPA 5.76 Mbps. Capacitive touch screen 3.2 inch TFT 16M colors with 640 x 360 resolution. 5 MP camera supports VGA 15 fps recording, geographical information. Symbian Anna. ARM 11 1GHz CPU and 256 MB RAM. Wi-Fi 802.11 b / g

Nokia 500 Read More »

Nokia 700

Nokia 700

Specifications: General: GSM 850/900/1800/1900 MHz, UMTS 850/900/1700/1900/2100 MHz, HSDPA 14.4 Mbps, HSUPA 5.76 Mbps Dimensions: 110 mm long, 50.7 mm wide and 9.7 mm thick; Heavy machine 96 g Screen: AMOLED touch 3.2-inch size with 16 million pixels. The screen uses Nokia’s ClearBlack technology. Memory: 2 GB of internal memory, microSD card slot supporting 32GB

Nokia 700 Read More »

Nokia X7

Nokia X7

Design, camera and screen Nokia X7 owns 4 inch big screen and a thickness of 12mm, although not classified as thin ranks of smartphones, but more than enough to please users. Ministry casing is made of metal for solid feel and “dress up”. Equipped with an 8 megapixel camera with 2 flash, X7 for the

Nokia X7 Read More »

Nokia X5 01 1

Nokia X5-01

Design Compact but easy messaging is what Nokia X5-01 trying to achieve. Specifically, Nokia’s products have only 74.3 x 66.4 dimensions mm (length x width) and a QWERTY keyboard, with large thicknesses of up to 16.9 mm. We can also sense the Nokia X5-01 square, first glance. Curve in bringing back the phone feeling more

Nokia X5-01 Read More »

Nokia X3 02

Nokia X3-02

Design Nokia X3-02 is very thin and lightweight, accurate thickness is 9.6mm. Small touch screen 2.4 inches, the keyboard is designed to clearly and has 2 dedicated buttons for messaging and open the music player. This handset is especially suitable for women, who were like a stylish phone and the ability to listen to music

Nokia X3-02 Read More »

Nokia E6 2

Nokia E6

Design Designed based on the inspiration brought success for Nokia E71, Nokia E72, Nokia E6 inherited the essence and refined, as well as the latest technology in order to provide users with a fresh feeling. The phone was quite sure with relatively advanced material from the alloy, Gorilla Glass screen and synthetic resins. Sadly, the

Nokia E6 Read More »

Nokia C2 2

Nokia C2-00

Design Nikia C2-00 has the same simple design like the vast majority of the low-range phone from Nokia. Machine with 1.8 inch TFT 128×160 pixel resolution, of course, users can not require a lot of possibilities for display by fairly flat colors, brightness and viewing angles are very narrow weak. Also resistant to glare in

Nokia C2-00 Read More »

Nokia C2 01 1

Nokia C2 – 01

The design To keep prices low, the box Nokia C2-01 contains only the phone, charger and a headset. Nokia C2-01 is not a compact phone with dimensions as large as 109,8×46,9×15,3. With plastic casing, this handset weighs 89g. In addition, Nokia also equip their products 2 inch TFT display with QVGA resolution (240 x 320),

Nokia C2 – 01 Read More »